Close Menu

    Vancouver Island Sees Unexpected Surge in Domestic Tourism

    07/02/2026

    From “I Hope” to Hollywood , Gabby Barrett’s Quiet Rise

    07/02/2026

    From Studio to Silence , Kelly Clarkson’s Graceful Exit From TKCS

    07/02/2026

    After Four Seasons, ‘Sherri’ Signs Off — and Sherri Shepherd Isn’t Done

    07/02/2026

    Miami Airport’s Cruise Traffic Boom Is Reshaping Airline Schedules

    07/02/2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Facebook X (Twitter)
    Travel News
    • Home
    • About Us
    • Contact Us
    Facebook X (Twitter) RSS
    SUBSCRIBE
    • Travel
      • Air Travel
      • Flights, Airlines & Airports
      • Travel Agents
      • Tour Operators
    • Holidays
      • Hotels
      • Holiday Destinations & Resorts
      • Cruises
      • Tourism
    • City Breaks
    • Winter Breaks
    • Lifestyle
    • Submit story
    Travel News
    Home » Manchester Airport station set to close for three weeks in January
    Air Travel

    Manchester Airport station set to close for three weeks in January

    News TeamBy News Team03/11/2014No Comments2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email

    The railway station at Manchester Airport will close for three weeks in the New Year as work to complete the new fourth platform is carried out, the Lancashire Evening Post has reported.

    In order to accommodate the new platform work – which also includes finishing platform improvements with new CCTV and information screens – only two platforms will be in use between Sunday 11th and Saturday 17th January. The station will then be closed to all trains until Monday 9th February.

    In January, travellers will face disruption and may have to find alternative ways to reach the airport as Network Rail begins to install the new track and signalling. The authorities will be providing information on replacement buses shortly, the report said.

    Wayne Poole, director of passenger services for Manchester Airport, said: ‘We’ll be working with the variety of partners that are involved in the fourth platform works to minimise disruption during the station closures.

    We continue to work with transport providers to look at ways to further enhance access to the airport.’

    Ian Joslin, area director for Network Rail, said: ‘While there is never a good time to close the railway we have worked closely with the airport, Metrolink and train operators to complete this work at a time which will impact the fewest numbers of passengers and I apologise for any short-term inconvenience while we deliver these long-term benefits.’

    Transport for Greater Manchester’s Metrolink director, Peter Cushing, said: ‘With the opening of the new airport line in November, the new heavy rail fourth platform will represent an excellent example of heavy and light rail integration at one of the best road and rail connected airports in the country.

    Read Also  Two Million Ready for Grand Summer Holiday Getaway

    ‘We are grateful to both Metrolink and rail passengers for their patience while this, ultimately, beneficial work is carried out.’

    The platform upgrade, which is part of the £1bn+ investment in the railway, will allow extra services to call at the airport and provide passengers with better access from across the north of England.

    Manchester rail
    News Team

    Related Posts

    Miami Airport’s Cruise Traffic Boom Is Reshaping Airline Schedules

    07/02/2026

    British Travelers Are Packing Lighter—and Spending Smarter

    28/01/2026

    Why Rural Airports Are Losing Routes Despite Federal Subsidies

    28/01/2026
    Leave A Reply Cancel Reply

    Tourism

    Vancouver Island Sees Unexpected Surge in Domestic Tourism

    By News Team07/02/20260

    By the end of April 2025, something strange was occurring. Parksville hotels filled up more…

    From “I Hope” to Hollywood , Gabby Barrett’s Quiet Rise

    07/02/2026

    From Studio to Silence , Kelly Clarkson’s Graceful Exit From TKCS

    07/02/2026

    After Four Seasons, ‘Sherri’ Signs Off — and Sherri Shepherd Isn’t Done

    07/02/2026
    • Facebook
    • Twitter
    Categories
    • Air Travel
    • Blog
    • Business
    • City Breaks
    • Cruises
    • Finance
    • Flights, Airlines & Airports
    • Holiday Destinations & Resorts
    • Holidays
    • Hotels
    • Lifestyle
    • News
    • Press Release
    • Technology
    • Timeshares
    • Tour Operators
    • Tourism
    • Travel
    • Travel Agents
    • Weather
    • Winter Breaks
    About
    About

    Stokewood House, Warminster Road
    Bath, BA2 7GB
    Tel : 0207 0470 213
    info@travel-news.co.uk

    Vancouver Island Sees Unexpected Surge in Domestic Tourism

    07/02/2026

    From “I Hope” to Hollywood , Gabby Barrett’s Quiet Rise

    07/02/2026

    From Studio to Silence , Kelly Clarkson’s Graceful Exit From TKCS

    07/02/2026
    Pages
    • About Us
    • Contact Us
    • Privacy Policy
    Facebook X (Twitter)
    © 2026 Travel News

    Type above and press Enter to search. Press Esc to cancel.