Close Menu

    Vancouver Island Sees Unexpected Surge in Domestic Tourism

    07/02/2026

    From “I Hope” to Hollywood , Gabby Barrett’s Quiet Rise

    07/02/2026

    From Studio to Silence , Kelly Clarkson’s Graceful Exit From TKCS

    07/02/2026

    After Four Seasons, ‘Sherri’ Signs Off — and Sherri Shepherd Isn’t Done

    07/02/2026

    Miami Airport’s Cruise Traffic Boom Is Reshaping Airline Schedules

    07/02/2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Facebook X (Twitter)
    Travel News
    • Home
    • About Us
    • Contact Us
    Facebook X (Twitter) RSS
    SUBSCRIBE
    • Travel
      • Air Travel
      • Flights, Airlines & Airports
      • Travel Agents
      • Tour Operators
    • Holidays
      • Hotels
      • Holiday Destinations & Resorts
      • Cruises
      • Tourism
    • City Breaks
    • Winter Breaks
    • Lifestyle
    • Submit story
    Travel News
    Home » Crossrail Announces Replacement of Railway Bridges
    Travel

    Crossrail Announces Replacement of Railway Bridges

    News TeamBy News Team05/11/2012No Comments2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email

    Network Rail, on behalf of Crossrail, a major new railway that is under construction in the South East England, and which will link Berkshire and Buckinghamshire to Essex and Kent, via Greater London, has commenced the restoration of four bridges in Slough and Hillingdon, in readiness for the new electric train service.

    The Crossrail railway link is currently being constructed across central London, and is expected to open in 2018, operating up to 24 trains per hour between Paddington and Whitechapel, during peak hours of service.

    The new electric trains are intended to provide a faster, cleaner, smoother and more dependable train service than existing diesel suburban trains. However all bridges on the route must be cleared for the installation of over-head electric equipment. Middlegreen Road Bridge and Trenches Bridge in Slough, and Old Stockley Road Bridge and Horton Bridge in Hillingdon, will be renovated as part of the upgrade.

    Network Rail will carry out the bridge replacement project on behalf of Crossrail, with a proposed completion date Easter 2013.

    Jorge Mendonca, the Crossrail programme director for Network Rail, said, ‘Crossrail will transform the journeys of passengers who wish to travel into or across central London. The work we are undertaking on bridges across the western section of the route will not only enable new longer Crossrail trains to operate but is also an essential part of the programme to electrify the Great Western main line.

    During Christmas and Easter we will be removing the old bridges and installing new ones. We’ve spent months preparing for this to ensure we complete the work with the least possible impact on residents.’

    Read Also  VisitBritain to Woo Chinese Travellers

    Crossrail will also include a major development at Paddington. The 320,000 sq ft development is located at the intersection of Bishop’s Bridge Road and the Grand Union Canal, and will include 15 storeys of office space, as well as retail outlets.

    The building will provide access to Crossrail, National Rail and Hammersmith & City line services at Paddington.

     

    London Network Rail
    News Team

    Related Posts

    Why Rail Replacement Buses Are Driving Travelers Back to Cars

    07/02/2026

    Dimitris Giannakopoulos Net Worth: What Fuels His Billion-Euro Empire?

    28/01/2026

    British Travelers Are Packing Lighter—and Spending Smarter

    28/01/2026
    Leave A Reply Cancel Reply

    Tourism

    Vancouver Island Sees Unexpected Surge in Domestic Tourism

    By News Team07/02/20260

    By the end of April 2025, something strange was occurring. Parksville hotels filled up more…

    From “I Hope” to Hollywood , Gabby Barrett’s Quiet Rise

    07/02/2026

    From Studio to Silence , Kelly Clarkson’s Graceful Exit From TKCS

    07/02/2026

    After Four Seasons, ‘Sherri’ Signs Off — and Sherri Shepherd Isn’t Done

    07/02/2026
    • Facebook
    • Twitter
    Categories
    • Air Travel
    • Blog
    • Business
    • City Breaks
    • Cruises
    • Finance
    • Flights, Airlines & Airports
    • Holiday Destinations & Resorts
    • Holidays
    • Hotels
    • Lifestyle
    • News
    • Press Release
    • Technology
    • Timeshares
    • Tour Operators
    • Tourism
    • Travel
    • Travel Agents
    • Weather
    • Winter Breaks
    About
    About

    Stokewood House, Warminster Road
    Bath, BA2 7GB
    Tel : 0207 0470 213
    info@travel-news.co.uk

    Vancouver Island Sees Unexpected Surge in Domestic Tourism

    07/02/2026

    From “I Hope” to Hollywood , Gabby Barrett’s Quiet Rise

    07/02/2026

    From Studio to Silence , Kelly Clarkson’s Graceful Exit From TKCS

    07/02/2026
    Pages
    • About Us
    • Contact Us
    • Privacy Policy
    Facebook X (Twitter)
    © 2026 Travel News

    Type above and press Enter to search. Press Esc to cancel.